Secret: 10 traps in the process of cleaning and packaging!

1, latex paint

Stealing index:

Phenomenon: Latex paint is currently the most common wall decoration material, which can be painted, rolled or sprayed during construction. If the worker is not serious or perfunctory when working, there will often be a slight color difference. This problem is especially the case with deeper latex paints.

Warm Tips: Latex paint needs to add some water before use, and the used latex paint should be used up once. It is also best to paint the same color once. If the wall needs to be repaired after the construction is completed, the entire wall should be repainted.

2, the water pipeline

Stealing index:

Phenomenon: During the renovation of the construction team, sometimes construction waste containing a large amount of cement, sand and concrete pieces was poured into the sewer for the sake of saving. The direct consequence of this is that the sewers are severely blocked, causing the kitchen and bathroom to run out of water due to poor water flow. Although some projects have no problems at the final acceptance, they always have problems with poor water supply.

Warm reminder: Strictly supervise the construction team, can not take the water channel as a garbage channel. After the construction of the waterway is completed, fill all the basins, basins and bathtubs with water, and then release the water at the same time to see if the water is unobstructed and whether there is leakage in the pipeline.

3, wire connector

Stealing index:

Phenomenon: When installing electric sockets, switches and lamps, electricians do not wire according to construction requirements. Especially when consumers use some electric appliances such as water heaters and air conditioners that consume a large amount of electricity, the switches and sockets are heated or even burned, which brings great economic losses to consumers.

Warm reminder: During the construction, the supervisory electrician shall strictly follow the operation rules. After all the switches and sockets are installed, they must be used in practice to see if there is any fever in these parts.

4, wall and floor tiles

Stealing index:

Phenomenon: paving wall tiles is a technically strong process. If workers cut corners, it is most likely to have problems such as empty tiles and uneven seams. In addition, the cement and adhesive used for laying tiles are also very particular. If the ratio is unreasonable, problems such as falling off may occur.

Warm reminder: According to the "Standards for the Acceptance of Quality of Family Room Decoration Project" issued by the Beijing Municipal Construction Committee, the wall and floor tiles should be laid flat and firm, with clear patterns, no dirt and mud marks, the surface color is basically the same, the joints are uniform, and the plates are crack-free. , corners and ribs, local hollow drums must not exceed 5% of the total.

5, wall trough

Stealing index:

Phenomenon: The buried pipeline must be slotted on the wall and the ground to bury the pipeline. A few workers were brutally engaged in the grooving operation, which not only damaged the building load-bearing structure, but also caused damage to other pipelines nearby.

Warm reminder: Before construction, confirm with the construction team leader about the direction and location of the pipeline. Slotting requirements are different for different wall structures. The load-bearing wall in the house is not allowed to be slotted, and the wall with insulation layer can easily crack on the surface after slotting, and the groove on the ground should be careful not to damage the floor, to the residents downstairs. Create trouble.

6. Stealing index:

Phenomenon: In some places where the wall is in contact with the door and the window, and where the two different colors of paint are docked, it is also the place where the workers often perfuse things. You will often see the latex paint and the paint on the butt joints intermingling with each other and various problems at the seams.

Warmth Tip: It is very important for the seams to be handled. You must supervise the workers to work seriously. If there are two colors of paint on the wall, the tape must be applied to the edge of the first color during construction, and another color of paint should be applied to it. After peeling off the tape, the entire seam can be very neat.

7, wire through the tube

Stealing index:

Phenomenon: In home decoration construction, almost all wires are worn in PVC pipes and buried in the walls. Therefore, after the wire is put into the PVC pipe, the consumer cannot see it at all, and the replacement is difficult. If the worker is not serious in the operation, it will cause the wire to kink in the tube, causing power hazards. If the worker intentionally cuts the work, he or she will use the wire with the joint or put a few wires into the same PVC pipe.

Warm reminder: Consumers should buy their own wires, then supervise the workers on site, and conduct power-on inspection after installation. In addition, consumers must let the renovation engineering team leave a "pipeline map." When the electrician just buried the wires in the wall, they should number the walls and draw a plan, then use the pen to draw the direction and location of the wires, indicating the distance from the floor to the ground and the adjacent wall. In particular, the joint location of the pipeline should be indicated so that in the event of a fault, the line location can be found immediately.

8, facet processing

Stealing index:

Phenomenon: The so-called "small noodles" are small places that consumers can't see and pay less attention to, such as the upper edge of the door, the underside of the window sill, the inside of the heating hood, etc. Some workers will be here. Cut corners and even do nothing.

Warm Tips: Remember that any object has 6 planes, don't ignore any details when testing the quality of the project.

9, the ground leveling

Stealing index:

Phenomenon: The floor of some houses is not flat enough and needs to be re-leveled during renovation. If the workers are not careful or intentionally shoddy, it will cause the problem of “more and more uneven”, and the cement mortar used in the construction will greatly increase the ground load and bring hidden dangers to the safety of the building.

Warm reminder: Before the ground leveling, the ground surface treatment must be done first, then the cement mortar is used to level the ground. After the cement has dried out, use a special level to determine the flatness of the entire ground before proceeding to the next step.

10, substrate processing

Stealing index:

Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners in this area during construction, which may result in uneven wall surface, color difference after latex paint, and discoloration of latex paint, or poor tile adhesion.

Warm reminder: In the paving construction of wall tiles, you should pay attention to the fact that the tiles can not be directly placed on the surface of lime mortar, lime paste, paper lime paste, hemp mortar and latex paint, but the base layer should be cleaned. It can be laid at the rear. The bonding paste used between the tile and the substrate shall be formulated in strict accordance with the construction standards and proportions, using the specified cement and adhesive materials, and shall not be randomly adjusted.

Document.body.oncopy = function () { setTimeout( function () { var text = clipboardData.getData("text"); if (text) { text = text + " This article comes from China Wooden Door Network, China's well-known wooden door industry portal Website! (http://) Detailed reference: "+location.href; clipboardData.setData("text", text); } }, 100) }

65ML Lighter Butane Gas Refill

Lighter Butane Fuel,Refined Butane Gas,Butane Gas Use In Lighter,65Ml Lighter Butane Gas Refill

Viva Lighter (Chenzhou) Co.,Ltd , https://www.vivalightercz.com